Anstey Horne was appointed by Stoford to provide Typhoo Wharf CDM Principal Designer services from 2022, supporting the transformation of the former Typhoo Tea Factory in Digbeth into a major new development centred on the BBC’s Birmingham headquarters.
Our role focused on identifying foreseeable risk early, bringing structure to design-risk management and coordinating an effective transition between the pre-construction and construction phases.
The result is a landmark redevelopment that combines the retention of Birmingham’s industrial heritage with a new, highly sustainable broadcasting centre and the wider regeneration of Typhoo Wharf.
Transforming the former Typhoo Tea Factory
Typhoo Wharf occupies a strategically important location in Digbeth, close to Birmingham city centre and the new HS2 infrastructure.
At its centre is the former Typhoo Tea Factory on Bordesley Street. The first phase has transformed the historic building to provide approximately 84,000 sq ft of purpose-built accommodation for the BBC, alongside Typhoo Square and improvements to the surrounding public realm and connectivity. Parts of the former factory were demolished while the original Bordesley Street façade was retained.
The BBC development is only the first stage of the wider regeneration. The Typhoo Wharf masterplan covers more than 10 acres and provides for up to 800,000 sq ft of future residential and commercial development.
Our Typhoo Wharf CDM Principal Designer role
Stoford appointed Anstey Horne as CDM Principal Designer during the pre-construction phase.
Our approach placed health and safety risk management within the developing design process, rather than treating CDM as a separate compliance exercise.
Our work included:
- identifying foreseeable health and safety risks during pre-construction;
- developing and coordinating Pre-Construction Information;
- advising where further surveys and investigations were required;
- reviewing design information from a health and safety perspective;
- coordinating relevant information between the client, designers and contractors;
- monitoring the design team’s discharge of its CDM duties; and
- supporting Stoford in meeting its responsibilities as commercial client.
This approach was particularly focused on identifying risk early and providing a clear structure for design-risk management as the project developed.
Under CDM 2015, the Principal Designer must plan, manage, monitor and coordinate health and safety during the pre-construction phase. This includes working with designers to eliminate foreseeable risks where possible and reduce or control risks that cannot be eliminated.
Bringing structure to design-risk management
On a major redevelopment, effective CDM management involves more than producing documents and risk registers.
Information has to move effectively between the developer, designers, consultants and contractors. Significant design risks need to be identified, communicated and considered by the people best placed to manage them.
At Typhoo Wharf, Anstey Horne helped Stoford establish this structured approach to design-risk management.
Our role included developing Pre-Construction Information and working with the wider project team to make relevant health and safety information available during the design process.
This reflects the wider purpose of CDM 2015: influencing risk while design decisions are still being made and there is the greatest opportunity to eliminate or reduce foreseeable hazards.
CDM tender review
Anstey Horne’s involvement extended into the tender process.
We carried out a formal CDM tender review, considering the health and safety information provided by tendering contractors and reporting to Stoford on the suitability of the submissions.
This helped connect the management of design risk during pre-construction with preparations for delivery on site.
BAM subsequently became the main contractor for the BBC development.
Managing the transition into construction
A key part of our contribution was ensuring a controlled transition between the pre-construction and construction-phase Principal Designer roles.
Anstey Horne acted as Principal Designer during pre-construction. BAM subsequently assumed the Principal Designer role for the construction phase, while Anstey Horne remained involved as Stoford’s CDM Client Adviser.
Maintaining continuity through this transition was important. Design information, significant residual risks and CDM responsibilities still needed to be effectively communicated as the project moved from design into construction.
Our continuing Client Adviser role included reviewing the Construction Phase Plan, monitoring CDM compliance, undertaking a CDM site audit, advising on Principal Designer reports and risk registers and monitoring development of the Health and Safety File.
This gave Stoford continuity of CDM advice from the pre-construction phase through to construction.
A new home for BBC Birmingham
The first phase of Typhoo Wharf reached completion in April 2026. Stoford records the BBC development as approximately £60 million GDV, with BREEAM ‘Outstanding’ and EPC A credentials and net zero carbon in construction and operation.
The shell and core has now been handed over for the BBC’s internal fit-out, with the new broadcasting centre due to open in 2027.
The completed Tea Factory is both a new home for BBC Birmingham and a catalyst for the wider regeneration of this important part of Digbeth.
What Typhoo Wharf demonstrates about effective CDM
The Typhoo Wharf CDM commission demonstrates the value of bringing Principal Designer expertise into a development at an early stage.
For Anstey Horne, three principles were central to the commission:
- Identify foreseeable risk early, while there remains the greatest opportunity to influence the design.
- Bring structure to design-risk management so that responsibilities and significant risks are properly coordinated across the project team.
- Manage the handover between dutyholders so that important information and residual risks remain visible as the project moves into construction.
These principles helped give Stoford a structured approach to CDM during pre-construction, followed by continuity of advice through the construction phase.
CDM Principal Designer services
Anstey Horne provides CDM Principal Designer and CDM advisory services to developers, property owners and other commercial clients.
Our focus is on practical design-risk management, effective coordination between project dutyholders and helping clients meet their responsibilities under the Construction (Design and Management) Regulations 2015.
If you are planning a development, refurbishment or complex construction project, speak to our team about involving Anstey Horne at the earliest stages.