Anstey Horne

EWS1 Leeds

EWS1 Leeds

EWS1 Leeds is a critical issue for leaseholders, freeholders, managing agents, developers, and lenders across the city. If you own, manage, or plan to sell or refinance a residential building in Leeds, you will almost certainly face questions about the External Wall System and whether an EWS1 form is required. This guide explains what EWS1 Leeds involves, when you need an EWS1 form, how the assessment works, and how you can move forward with confidence.

Leeds has experienced rapid residential development over the past two decades. High-rise and mid-rise apartment schemes dominate areas such as the city centre, Holbeck, South Bank, and Headingley. Many of these buildings include cladding systems, balconies, and insulation products that now attract close scrutiny from valuers and lenders. As a result, EWS1 Leeds requests have become common even for buildings below 18 metres.

This article focuses on practical steps you can take, what surveyors assess, how outcomes affect value and lending, and how Anstey Horne supports clients through the full EWS1 Leeds process.

What is an EWS1 form and why it matters in Leeds

An EWS1 form is a standardised document used by valuers and mortgage lenders to confirm that a building’s external wall system has been reviewed for fire safety risk. The form relates solely to the external wall construction and attachments such as balconies. It does not confirm overall fire safety compliance for the building.

In Leeds, EWS1 forms became widespread following increased lender caution after major fire safety failures across the UK. Lenders use EWS1 Leeds outcomes to decide whether they will lend against flats within a building. Without an acceptable EWS1 rating, many transactions stall.

The current EWS1 form is the third edition issued in March 2022. Forms issued under earlier editions remain valid for five years from the date of signature. The form confirms whether the external wall system falls under Option A or Option B, with subcategories that indicate whether remedial works are required.

When you need an EWS1 Leeds assessment

You may need an EWS1 Leeds assessment in several common situations :

  • You plan to sell a flat and the buyer’s lender requests confirmation of external wall fire risk.
  • You want to remortgage and the valuer flags cladding or balconies.
  • You manage a residential block and lenders repeatedly request EWS1 confirmation.
  • You own a mixed-use building with residential accommodation above commercial space.
  • You plan remediation works and need clarity on external wall fire risk.

While early guidance suggested EWS1 applied mainly to buildings above 18 metres, lenders in Leeds frequently request EWS1 forms for buildings below this height where combustible materials may be present. Height alone does not determine whether an EWS1 Leeds assessment is required. External wall construction drives the decision.

Understanding Option A and Option B outcomes

The EWS1 form includes two main routes.

Option A applies where external wall materials are unlikely to support combustion. This route suits buildings where materials meet limited combustibility standards and cavity barriers appear correctly installed. Option A includes three possible outcomes depending on attachments such as balconies.

Option B applies where combustible materials are present or suspected. This route requires a higher level of fire risk assessment expertise. The assessor must consider the likelihood and consequences of fire spread and decide whether remedial works are required.

An Option B outcome does not automatically mean that cladding must be removed. A B1 rating confirms that the assessor considers fire risk sufficiently low that no remediation is required. A B2 rating confirms that remedial works are necessary.

In Leeds, many post-2000 apartment blocks fall under Option B due to insulation types, cladding systems, or balcony construction.

How EWS1 Leeds assessments are carried out

An EWS1 Leeds assessment follows a structured process. While the final output is a single-page form, the work behind it is detailed and evidence-led.

The process typically includes an initial desktop review. Surveyors examine available drawings, specifications, fire strategies, and previous reports. This step helps identify likely wall build-ups and areas of risk.

Next, the assessor inspects the building. This includes visual inspection of elevations, balconies, and accessible details. In many cases, intrusive inspections are required to confirm insulation type, cavity barriers, and fire stopping arrangements. These inspections may involve opening up external walls or balcony details.

Assessors evaluate findings against PAS 9980 guidance, which sets out how to assess external wall fire risk proportionately. The EWS1 form relies on this methodology and requires the assessor to use reasonable skill and care in reaching a conclusion.

Finally, the assessor completes the EWS1 form and provides supporting commentary to the client. While lenders usually see only the form, building owners should retain the supporting report.

Competence and who can sign an EWS1 Leeds form

EWS1 Leeds forms must be signed by a suitably competent professional. The competence requirements differ depending on whether the assessment falls under Option A or Option B.

Option A assessments require construction professionals who can identify materials and cavity barriers. These professionals must hold relevant qualifications and professional body membership.

Option B assessments require a higher level of expertise in fire risk assessment. For higher-risk buildings, this typically means a Chartered or Incorporated Engineer with demonstrable fire engineering competence.

For buildings below 18 metres, some professionals who have successfully completed the RICS EWS Assessment Training Programme may complete Option B assessments where appropriate. RICS publishes a list of successful completers to support transparency and competence checks.

In Leeds, lenders increasingly scrutinise the assessor’s credentials. Using a recognised, experienced firm reduces the risk of rejected forms.

Common Leeds building types affected by EWS1

EWS1 Leeds requests arise across a wide range of building types.

  • City centre apartment blocks with aluminium composite material panels, high-pressure laminates, or insulated render systems.
  • Student accommodation developments with balconies and lightweight cladding.
  • Mixed-use schemes with commercial podiums and residential towers above.
  • Converted mills and warehouses with modern over-cladding systems.
  • Low-rise blocks with timber balconies or decorative façades.

Even traditional-looking buildings may include modern materials behind the façade. You should not assume that age or appearance removes the need for EWS1 Leeds consideration.

How EWS1 Leeds affects property value and sales

An EWS1 outcome directly affects marketability. Flats in buildings without a valid EWS1 form often attract fewer buyers. Mortgage refusals lead to price renegotiations or aborted sales.

A clear Option A or B1 outcome improves confidence. Buyers and lenders gain reassurance that the external wall system does not require remediation. Transactions proceed more smoothly.

A B2 outcome introduces complexity but still provides clarity. While remedial works may affect value in the short term, a defined scope allows owners to plan funding, apply for grants where available, and move toward resolution.

In Leeds, many stalled transactions restart once an EWS1 form clarifies the position.

Timescales for EWS1 Leeds assessments

Timescales vary depending on building complexity, access arrangements, and whether intrusive inspections are required.

Desktop review and initial inspection often complete within one to two weeks.

Intrusive inspections may add time due to access, contractor availability, and making good.

Reporting and form completion typically follow shortly after inspection once findings are confirmed.

Delays often arise where information is missing or where access to all elevations proves difficult. Early engagement and clear communication help reduce delays.

Common mistakes to avoid with EWS1 Leeds

Several recurring issues cause frustration for building owners and leaseholders.

  • Instructing assessors without appropriate competence for Option B buildings.
  • Assuming one EWS1 form applies to multiple blocks with different construction.
  • Failing to allow for intrusive inspections when required.
  • Relying on outdated forms beyond the five-year validity period.
  • Sharing EWS1 forms without understanding reliance limitations for third parties.

A structured approach avoids these pitfalls and reduces the risk of wasted time and cost.

How Anstey Horne supports EWS1 Leeds clients

Anstey Horne provides EWS1 Leeds services as part of a wider building safety and fire risk consultancy offer. The team supports freeholders, managing agents, developers, and investors across Leeds and the wider Yorkshire region.

Support includes early-stage advice on whether an EWS1 form is likely to be required, coordination of desktop reviews and site inspections, and clear explanation of outcomes. Where intrusive inspections are necessary, Anstey Horne coordinates access and specialist input to minimise disruption.

The focus remains on proportionate assessment aligned with PAS 9980 principles. Clients receive practical guidance on next steps following the EWS1 outcome, whether that involves no further action or progression to remediation planning.

FAQs EWS1 Leeds

What does EWS1 stand for

EWS1 stands for External Wall System Form. It is a standard document used by lenders and valuers to confirm that a building’s external wall system has been assessed for fire safety risk.

Is an EWS1 form a legal requirement in Leeds

No. The EWS1 form is not a statutory requirement. Lenders and valuers request it as part of their risk assessment process.

Do all buildings in Leeds need an EWS1 form

No. Many buildings do not require an EWS1 form. However, if external wall materials or attachments raise fire risk concerns, lenders may request one regardless of height.

How long is an EWS1 form valid

An EWS1 form remains valid for five years from the date of signature unless significant changes occur to the external wall system.

Can one EWS1 form cover multiple buildings

No. Each block requires its own EWS1 form. Even adjacent buildings may have different construction.

What is the difference between B1 and B2 ratings

A B1 rating confirms that combustible materials are present but fire risk is sufficiently low that no remediation is required. A B2 rating confirms that remedial works are necessary.

Will an EWS1 B2 rating stop me selling my flat

A B2 rating makes sales more complex but does not make them impossible. Buyers and lenders need clarity on remediation scope and funding.

Does an EWS1 replace a fire risk assessment

No. The EWS1 form relates only to the external wall system. It does not replace a Fire Risk Assessment for the building.

Can an EWS1 form be challenged

Lenders may reject forms if they question competence, scope, or clarity. Using experienced assessors reduces this risk.

How do I start an EWS1 Leeds assessment

Start by gathering building information and seeking early advice from a specialist consultancy experienced in EWS1 Leeds assessments.

EWS1 Leeds continues to play a central role in residential property transactions across the city. Clear advice, competent assessment, and proportionate risk evaluation make the difference between stalled sales and successful outcomes.

Contact Us

For more information or to commission an EWS1 get in touch with us today. To arrange a no-obligation consultation - please call 020 4534 3130.

If you'd rather we called you, or for further information on EWS1 forms and FRAEW Surveys please fill in our contact form and we will be in touch.

For further information on all aspects of this service see the collection of articles in our blog.

To commission an EWS1 or FRAEW please call 020 4534 3130.

For further information on Fire Risk Assessment, Retrospective Fire Strategies, FRAEWs or advice in respect of your obligations as a building owner, developer or manager, please contact :

Sarah Taylor

Sarah Taylor

Business Support Manager

Building Surveying

London

Thomas Mead-Herbert

Thomas Mead-Herbert

BSc (Hons) MRICS C.BuildE MCABE

Director

Building Surveying

London

Charlie Powell

Charlie Powell

BSc (Hons) MRICS

Director

Building Surveying

Manchester