EWS1 FAQs: Your Guide to Forms, Ratings, Costs and Next Steps

Our EWS1 Survey FAQs are a selection of questions we are frequently asked about the EWS1 process. We have updated our EWS1 FAQs following the Royal Institution of Chartered Surveyors (RICS) publication of updated guidance on EWS Surveys.

EWS1 Survey FAQs

If you own, manage, buy or sell a flat, an EWS1 request can raise questions about fire safety, mortgage lending and potential building works. These EWS1 FAQs explain when you may need a form, what the ratings mean, who arranges the assessment and how to move forward.

Understanding the process starts with distinguishing three documents: the EWS1 form, the fire risk appraisal of external walls, known as an FRAEW, and the building’s wider fire risk assessment. Each serves a different purpose.

This guide answers the questions that leaseholders, freeholders, managing agents and resident management companies commonly face.

EWS1 FAQs: Understanding the Basics

What is an EWS1 form?

An EWS1 form records a competent professional’s conclusions about a building’s external wall system. Mortgage lenders and valuers use it to help assess whether external wall fire risks could create remediation costs that affect a property’s value.

EWS stands for External Wall System. The assessment concerns the construction of the outside walls and relevant attachments, including balconies.

Although people often call it an “EWS1 certificate”, the form does not certify the overall safety of the building. Government guidance confirms that it is neither a regulatory document nor a safety certificate.

Is an EWS1 form a legal requirement?

No. The law does not impose a general requirement to obtain an EWS1 form before selling a flat. However, a lender may request one before approving a mortgage.

Separate fire safety duties still apply. In England and Wales, the Fire Safety Act 2021 clarified that the Fire Safety Order covers the structure and external walls of buildings containing two or more sets of domestic premises.

A building owner must therefore distinguish a lender’s request for an EWS1 from the responsible person’s duties to assess and manage fire risk.

Does an EWS1 cover an individual flat or the whole building?

An EWS1 normally covers a building or block rather than an individual flat. Leaseholders in the same block can therefore use the same relevant form during separate transactions.

Check the building name and address carefully. A development containing several blocks may need separate assessments, particularly where construction differs.

Do not assume that a form for a neighbouring block covers your property simply because both buildings share a development name.

Is an EWS1 the same as a fire risk assessment?

No. A fire risk assessment considers the building’s wider fire precautions and management arrangements. An FRAEW examines external wall fire risks in greater detail where necessary. An EWS1 communicates an external wall assessment outcome for valuation and lending purposes.

For example, an external wall assessment does not establish whether all communal fire doors close correctly or whether management maintains escape routes.

The responsible person should consider relevant FRAEW findings within the wider fire risk assessment.

EWS1 FAQs: When You May Need a Form

Does every flat need an EWS1 form?

No. A lender or valuer should have a reason for requesting one. The building’s construction, available evidence and the lender’s requirements influence the decision.

Before commissioning an assessment, ask your lender or mortgage broker to confirm exactly what information they need. Then ask your managing agent whether the building already has that information.

This approach helps avoid paying for duplicate investigations or obtaining a document that does not answer the lender’s concern.

Do buildings below 18 metres need an EWS1?

Some can. Height alone does not determine whether a lender will request a form.

External wall materials, balconies and other construction features can raise questions in buildings below 18 metres. Equally, a building’s height does not automatically establish that a new EWS1 assessment is necessary.

If someone tells you that all buildings below 18 metres are exempt, ask them to explain the basis for that advice and confirm the position with your lender.

Does a brick building need an external wall assessment?

A competent assessor may establish that a straightforward masonry building presents sufficiently low external wall fire risk without commissioning a detailed FRAEW.

However, a brick appearance does not necessarily reveal the complete wall construction. Buildings can contain different wall systems, concealed insulation, cladding panels or combustible attachments.

Provide drawings and construction information where available. Ask the assessor to explain whether the evidence supports a straightforward conclusion or whether further investigation would resolve an important uncertainty.

Can balconies affect the outcome?

Yes. Balconies and other attachments can influence external fire spread and form part of the assessment.

When gathering information, include details of balcony decking, screening, soffits and any replacement materials. Tell the assessor about alterations that may not appear on the original drawings.

A useful assessment considers how the relevant construction affects risk in its actual setting, rather than drawing conclusions from the name of a material alone.

What should I do when my lender requests an EWS1?

Start by obtaining the request in writing. Establish whether the lender needs an existing form, an updated assessment or alternative evidence.

Next, contact the freeholder or managing agent. Request the current EWS1, any supporting external wall report and details of planned or completed remediation.

Check that the documents identify your block correctly. If information is missing, ask the building manager to coordinate a response with the assessor.

Keep your solicitor and broker informed so everyone works from the same documents and understands the outstanding questions.

Has RICS changed its EWS1 guidance?

Yes. RICS published its second edition of the professional standard for secured lending valuations of residential buildings with cladding in May 2026. It takes effect on 1 November 2026.

The standard helps valuers decide when to request an EWS1 and identify buildings where cladding remediation may affect valuation.

For a transaction spanning that date, ask your lender or valuer which requirements apply. Avoid relying on an old online checklist without checking its publication date and scope.

EWS1 FAQs: Understanding the Ratings

What do A1, A2, A3, B1 and B2 mean?

The form contains two assessment routes.

Option A concerns external walls whose primary materials meet limited combustibility criteria or better, with appropriate cavity barriers. Its subcategories address attachments.

Option B concerns external walls containing combustible materials and requires a fire risk assessment of the construction.

The categories do not form a simple scale from best to worst. In particular, an A outcome does not always mean that no work may arise, while a B outcome does not always mean that remediation is necessary.

What does an A1 rating mean?

A1 means that, within the Option A assessment, no attachments contain significant quantities of combustible materials.

What does an A2 rating mean?

A2 means that an appropriate assessment of the attachments concludes that they require no remedial works.

What does an A3 rating mean?

A3 identifies potential remedial costs relating to attachments where the A1 and A2 conclusions do not apply.

What does a B1 rating mean?

B1 means that combustible materials are present, but the assessor concludes that the fire risk is sufficiently low that remedial works are unnecessary.

What does a B2 rating mean?

B2 means that the assessor considers the fire risk sufficiently high to require remedial works.

Can I sell or remortgage a flat with a B2 rating?

Potentially, yes. A B2 rating does not automatically prevent mortgage lending.

Participating lenders can consider affected properties in England where evidence establishes an acceptable remediation or leaseholder protection position. Each lender applies its own criteria.

Ask your broker what evidence the proposed lender requires before submitting an application. Assemble that evidence with your solicitor and managing agent, rather than assuming that the rating alone determines the outcome.

EWS1 FAQs: FRAEW and PAS 9980

What is the relationship between an EWS1 and an FRAEW?

An FRAEW provides the detailed technical appraisal of external wall fire risk. An EWS1 records conclusions in a standard format for the lending process.

A suitable FRAEW can provide the evidence supporting an EWS1. However, an EWS1 does not replace the appraisal.

When commissioning work, clarify whether the appointment includes the technical report, the EWS1 form and any necessary follow-up explanation. This helps prevent a situation where you receive a form but lack the information needed to understand its findings.

What is PAS 9980?

PAS 9980 provides a methodology for assessing external wall fire risk in existing blocks of flats. It helps assessors reach proportionate conclusions about the need for risk reduction measures.

Government guidance published in September 2026 directs assessors to PAS 9980:2026.

When reviewing a proposal, ask the assessor to identify the assessment methodology and explain how they will investigate the building. If you already hold an older report, ask whether it still provides suitable evidence for your current purpose before commissioning replacement work.

Does every block need a detailed FRAEW?

No. The wider fire risk assessment should establish whether specialist external wall investigation is necessary.

Known or suspected risks associated with the wall construction can justify a detailed appraisal. In other buildings, a competent fire risk assessor may establish that external wall risk is sufficiently low without one.

If someone recommends an FRAEW, ask them to identify the construction concern, the information gap and the decision that the appraisal will help you make.

EWS1 FAQs: Commissioning the Assessment

Who should arrange an EWS1 assessment?

The building owner or the organisation managing the block normally coordinates the assessment. This may involve a freeholder, managing agent, resident management company, right to manage company or housing association.

A coordinated appointment helps the assessor obtain building records and arrange access.

If you own one flat, contact the managing organisation before instructing your own assessment. Establish what work already exists, who controls access and whether other leaseholders need the same information.

Who can sign an EWS1 form?

The signatory must meet the professional membership and competence requirements for the relevant assessment route.

Option B requires greater expertise in external wall fire risk than Option A. Building height can also affect the available qualification route.

Before appointing anyone, ask them to explain their eligibility for your building and proposed assessment. Request evidence of relevant experience and insurance, and confirm whether their appointment includes signing an EWS1 where appropriate.

What information should we provide?

Prepare an organised information pack containing the documents you hold.

Useful records include construction drawings, wall specifications, previous surveys, photographs, the current fire risk assessment and details of alterations or remediation.

Identify gaps openly. Mark drawings that show the original design rather than confirmed construction, and explain whether previous investigations covered every relevant wall type.

Ask the assessor to review the records before finalising the inspection scope. Good preparation can help target investigations and reduce avoidable return visits.

Will the assessor need to open up the walls?

They may need intrusive inspections where records and visible evidence cannot establish the relevant construction.

Opening-up can help confirm concealed materials, installation details and cavity barriers. The assessor should explain the proposed locations and why they need that evidence.

Before work starts, agree access arrangements, resident communications, protection of occupied areas and responsibility for making good. Ask how the team will deal with unexpected findings that require additional inspection.

How long does the process take?

Ask for a programme based on the actual scope rather than a generic promise.

The appointment may involve document review, access planning, inspections, further investigations and technical reporting. Missing records or additional findings can affect the programme.

For a time-sensitive sale, tell the assessor your target date at the outset. Ask them to distinguish the inspection date from the expected report date and identify decisions or information that you must provide to keep the work moving.

EWS1 FAQs: Costs and Deliverables

How much does an EWS1 assessment cost?

The cost depends on the work needed to reach a reliable conclusion. Reviewing suitable existing evidence differs substantially from investigating a complex building with several wall systems and limited records.

Request an itemised proposal. Establish whether it includes inspections, access equipment, opening-up, reinstatement, technical reporting, the form itself and responses to reasonable follow-up questions.

Compare scope as well as price. A low initial fee offers little benefit if essential investigation or reporting falls outside the appointment.

Who pays for the assessment?

Establish the payment arrangements before instructing work.

Ask the commissioning organisation to explain who will pay the invoice and whether it proposes to recover any costs through the service charge. If it proposes a charge to leaseholders, request the relevant lease provisions and an explanation of any applicable statutory protections.

Keep assessment costs separate from proposed remediation costs. The existence of an EWS1 request or an adverse rating does not, by itself, establish what an individual leaseholder must pay.

What should clients receive?

Agree the deliverables in writing before appointment. Request a clear record of the building assessed, evidence reviewed, inspections completed, findings and conclusions.

Where the assessment identifies action, ask for an explanation of the recommendations, priorities and any further investigation needed.

Also clarify whether the fee includes an EWS1, an FRAEW, photographs, inspection records and a meeting to explain the results.

The final information should help you understand what decision to take next and what evidence supports it.

EWS1 FAQs: Validity and Existing Forms

How long does an EWS1 form last?

EWS1 forms have a nominal five-year life. However, lender acceptance does not necessarily end on the fifth anniversary.

In April 2025, signatories to the UK Finance industry statement committed to avoiding blanket reviews solely because forms exceed five years. Acceptance remains subject to individual lender policy.

Before ordering a replacement because of its age alone, ask your lender whether it will accept the existing form and what supporting information it needs.

What should I do if someone questions the signatory’s eligibility?

Obtain the lender’s precise concern and ask what evidence would resolve it.

The April 2025 industry statement also addresses forms involving an invalid signatory. Participating lenders may consider alternative evidence rather than requiring wholesale reassessment in every case.

Ask the building manager to coordinate the response. Preserve the original report, inspection records and correspondence so that an independent professional can review the evidence if necessary.

Can we use an EWS1 issued before remediation?

Do not assume that the earlier form describes the completed building.

Give the assessor the remediation scope, construction records, inspection evidence and completion information. Ask them to confirm what further review they need to assess the current position.

Plan this process before the works finish. Agree who will inspect concealed work, retain evidence and provide any updated reporting. This reduces the risk of reaching completion without the information needed to answer lenders’ questions.

EWS1 FAQs: What Happens Next?

What should a building owner do after an assessment identifies remedial work?

Arrange a discussion with the assessor to understand the findings and priorities. Establish whether the responsible person needs to review the wider fire risk assessment or consider interim measures.

Develop an action plan with named responsibilities, realistic dates and a process for monitoring progress.

Before commissioning major works, clarify the required outcome, design responsibilities, approvals, funding arrangements and inspection strategy. Keep residents informed about the findings and the planned response.

Can an EWS1 secure government funding?

An EWS1 alone does not establish eligibility for remediation funding.

Funding applications follow their own technical and administrative requirements. For example, government guidance explains that an existing EWS1 may provide useful evidence, but applicants may still need a suitable FRAEW.

Ask the organisation managing your application to confirm the current scheme requirements before commissioning additional reports. Check whether existing investigations can support the application and identify the specific gaps that remain.

What can leaseholders do if their managing agent does not respond?

Send a focused written request identifying your block, the document you need and any transaction deadline.

Ask whether an assessment exists, who holds it and when you can expect a response. If work remains outstanding, request the current status and the person responsible for progressing it.

Keep a record of correspondence. Use the managing agent’s complaints procedure where necessary, and ask your solicitor or the Leasehold Advisory Service about the appropriate next steps for your circumstances.

How can Anstey Horne help with EWS1 FAQs?

Anstey Horne’s fire consultancy team can help you understand your building’s external wall assessment needs and the relationship between EWS1 forms, FRAEWs and remediation.

Start by sharing your building address, any lender request and the reports you already hold. This gives the team the information needed to discuss an appropriate scope and practical next steps.

Whether you manage a residential block or need clarity before selling a flat, contact Anstey Horne to discuss your EWS1 questions.

Loading cards...